At 18:10 on the 10th Xu, Beijing-Shanghai high-speed railway to Shanghai the direction of the G151 train failure. After emergency repairs in Shandong, 19:37 that night repair is completed, the current line has been restored. Reporters from the railway authorities learned that the preliminary investigation, the accident was mainly caused by a lightning storm a fault in the catenary. After the incident, the vehicle parked in Shandong emergency repairs. After more than 1 hour of repair, the line returned to normal.
Affected, with varying degrees of follow-up the train late. Reporters learned from the Shanghai railway sector, as 22:30, a total of 11 trains delayed. (Reporters Guyuan Kun, Yang Jin-Zhi)